Gary Hinshaw’s Tehachapi, BC Railroad

The Prototype

  • Prototypical/Freelanced: Prototype
  • Prototype: UP’s Tehachapi Pass
  • Location: Bakersfield to Mojave CA
  • Era: modern (2010+)
  • Interchange: BNSF trackage rights

The Layout

  • Location: Vancouver
  • Scale: N
  • Size: 10ft x 20 ft
  • Control: DCC Digitrax duplex radio; WiThrottle/EngineDriver
  • Accessibility: 7 stairs and 56” nod-under
  • Length of mainline: 3.3 scale miles
  • Yards: 2 stub-end yards (9 and 6 tracks), 1 serial staging helix (8 train capacity)
  • Passing sidings: 2 sidings and 1 scale mile of double track
  • Scenery complete: 1% (mainline mostly ballasted)
  • Carspots: 4 (~12 in full plan)
  • Motive power: modern diesel (65% GE, 35% EMD, 90% Kato)
  • Rolling stock: 400 cars: intermodal, grain, autos, lumber, manifest
  • Track construction: mainline: Micro engineering code 55 concrete tie with hand-laid turnouts; yards: Peco code 55 flex & turnouts

Operations

  • Clock Speed: 5:1
  • Session Length: 2.5 hours
  • Crew Size: 5-6
  • Dispatching: CTC (in development)
  • Car Forwarding: tabs for locals, none for through freights
  • Communication: in development
  • Jobs: dispatcher, staging manager, road crews, pusher crews
  • Train lengths: 30-40 60 ft cars (12-16 actual feet)
  • Session atmosphere: casual, fun

More Information